PROJECT KAMI


Sandblasting painting Chain set            

 

Tahun : September 2012

Project Description : Sandblasting Coating PT. MHE Demag Indonesia

Object :  2 unit Chain set panjang masing-masing 100 meter

Location : Workshop Revology Indonesia, Cileungsi, Gunung Putri, Bogor

==========================

Tahun : September 2012

Project Description : Epoxy Floor Coating tebal 500 micron PT.DSI Laser Indonesia.

Object : Lantai Laser Room

Location : Cikarang, Bekasi

=========================

Tahun : September 2012

Project Description : Sandblasting Coating Internal and External Pipes, PT. Kumala Wandira Danarta (AETRA Project)

Object : Steel Pipes

Location : Workshop Revology Indonesia, Cileungsi, Gunung Putri, Bogor

============================

Tahun : Juli 2012

Project Description : Sandblasting And Painting Eksternal Pipes PT. Paramita Bangun Sarana

Object : Steel Pipes

Location : Workshop Revology Indonesia, Cileungsi, Gunung Putri, Bogor

============================

Tahun : Maret 2012

Project Description : Repainting

Object : Gas Pipe line

Location : PT.Bekasi Power site, Jababeka, Cikarang Bekasi

==================

Tahun : Desember 2011 – Februari 2012

Project Description : Sandblasting,  Painting

Object : Conveyor Structure

Location : Workshop PT. Mandiri Inti Perkasa, Bekasi

conveyor steel structure

conveyor steel structure

IMG00925-20120201-1145_editIMG00895-20120201-1118_editIMG00903-20120201-1122_editIMG00905-20120201-1123_edit

=================

Tahun : Oktober 2011

Project Description : Epoxy Floor Coating

Object : Work Area & Walk way

Location : PT. Interact Corpindo, Bekasi

================

Tahun : Agustus 2011

Project Description : Sandblasting (SSPC SP-10 atau setara SA 2.5)

Object : Base Frame and Skid Base

Location : Workshop Revology Indonesia, Pondok Gede, Bekasi and

PT.KSB Indonesia, Kawasan Industri MM2100 Cibitung, Bekasi

===================

sandblasting, ponton

sandblasting, ponton

Primer Coat Ponton PT KSB IndonesiaTahun : Juni 2011

Project Description : Sandblasting (SSPC SP-10 atau setara SA 2.5)

Object : Skid Base And Ponton

Location : Workshop PT.KSB Indonesia, Kawasan Industri MM2100 Cibitung, Bekasi

====================

Tahun : Februari 2011

Project Description : Sandblasting (SSPC SP-10 atau setara SA 2.5) dan Coating

Object : Cooling Tower Pipe

Location : Water Treatment Plant, Hotel Borobudur, Jakarta

DSC00723_edit

Sandblasting Coating Cooling Tower Pipes

DSC00700_edit

=================

Tahun : Juli 2010

Project Description : Epoxy Floor Coating (Thick.350 Micron)

Object : Battery Room Floor

Location : PT Krakatau Daya listrik, Cilegon

================

Tahun : Juni 2010

Project Description : Sandblasting (SSPC-SP 10 setara SA 2) & Painting

Object : Retro Clamp(Pertamina)

Project Owner : PT. SIER

===================== 

Tahun : Juni 2010 (Tahap II)

Project Description : Sandblasting (SSPC-SP 10 setara SA 2.5) & Painting Primer

Object : GE. Main Cabin, Engine Cabin & Radiator Cabin (Locomotive)

Project Owner : PT.LASER METAL MANDIRI, Cikarang-Bekasi

====================

Tahun : Mei – Juni 2010

Project Description : Sandblasting (SSPC-SP 10 setara SA 2.5)

Object : Kiln

Location : Lampung

=================

Tahun : April 2010

Project Description : Sandblasting (SSPC-SP 6 setara SA 2) & Painting Primer

Object : Sheet Steel Pile

Project Owner : PT.NUSANTARA SEDAYA SEJAHTERA, Bekasi

Location  : Workshop Revology Indonesia, Pondok Melati-Bekasi

===***===

Tahun : Januari 2010 (Tahap I)

Project Description : Sandblasting (SSPC-SP 6 setara SA 2) & Painting Primer

Object : GE. Train Engine Cabin & Radiator Cabin

Project Owner : PT.LASER METAL MANDIRI, Cikarang-Bekasi

Location  : Jababeka II Industrial State, Cikarang Baru-Bekasi

===***===

Tahun : Desember 2009

Project Description : Sandblasting SSPC-SP 10 setara SA 2.5

Object : Pyllar Hydrant (14 Unit)

Project Owner: PT. SABERINDO PACIFIC, Jakarta Pusat

Location : Workshop Revology Indonesia, Pondok Melati-Bekasi

===***===

sandblasting_locomotif PT.Laser Metal Mandiri

Tahun : Nov 2009

Project Description : Sandblasting (SSPC-SP 6 setara SA 2)

Object : GE. Train Cabin & CDC

Project Owner : PT.LASER METAL MANDIRI, Cikarang-Bekasi

Location : Jababeka II Industrial State, Cikarang Baru-Bekasi

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s